Start with mesh rolls, top rail, line posts, terminal and corner posts, gate posts, and tension wire. Round rolls and stock pieces up because part of a package cannot usually be purchased.
Use local prices only after quantities are settled. This keeps the calculation useful even when prices change at a store.
Hardware checklist
Verify rail ends, brace bands, tension bands, caps, ties, gate hardware, and any bottom tension system against the manufacturer’s instructions.